Garden Maintenance
Scheduled visits that keep a finished garden looking the way it was drawn.
180
+
Gardens completed
15
Years in business
11
People on the team
03
Mission
A new garden takes three years to fill out. Maintenance is what decides whether those three years go the right way.
Levels before lines
We survey the falls and dig a soil pit first. A garden that fights its own slope never settles.
Drainage you never see
Soakaways, channel drains and a fall away from the house, designed in rather than added after the first storm.
Stone laid on a proper base
Full mortar bed, cut on site, pointed by hand. It is the part nobody photographs and the part that fails first.
Planted for three winters
Structure first, then the seasonal layers. We choose for the soil you have, not the soil the plan would prefer.